Tunnel Bridge
Tunnel Bridge
• - Arrow - points in direction of travel.
1 Front tunnel bridge
• Removing:
- Remove the nuts - 2 - (2 on each side).
2 Hex nut
• Quantity: 4 per tunnel bridge
• Tightening specification: 20 Nm
3 Rear tunnel bridge
• Removing:
- Remove the nuts - 2 - (2 on each side).