Operation CHARM: Car repair manuals for everyone.

Removal and Replacement






Pistons and Connecting Rod Overview






1 Bolt

30 Nm + 90° (1/4) additional turn.

Always replace.

Lubricate the threads and contact surfaces.

Tighten the bolts to 30 Nm to measure the radial play, do not tighten the additional turn.

2 Pressure Relief Valve

27 Nm

Opening pressure 1.3 to 1.6 bar excess pressure.

3 Oil Spray Jet

For piston cooling.

4 Connecting Rod Cap

Pay attention to the installed position.

Due to the separation procedure (cracking) of the connecting rod, the cap only fits in one position and only to the corresponding connecting rod.

Mark which cylinder to which it belongs - B -.

Installed position: The marks - A - point to belt pulley side.

5 Bearing Shell

Pay attention to the installed position.

Do not interchange used bearing shells (mark them).

Axial play:

New: 0.10 to 0.35 mm

Wear limit: 0.4 mm

Measure radial clearance using Plastigage(R):

New: 0.02 to 0.06 mm

Wear limit: 0.09 mm

Do not rotate the crankshaft when measuring radial play.

6 Connecting Rod

With a cracked bearing cap.

Separating the new connecting rod. Refer to => [ New Connecting Rod, Separating ] Procedures.

Only replace as a set.

Mark which cylinder to which it belongs - B -.

Installed position: Marks - A - point to the belt pulley side.

7 Lock Ring

8 Piston Pin

If difficult to move, heat the piston to 60 °C (140 °F).

Remove and instal using the pilot drift (VW 222 A).

9 Piston

Checking, refer to => [ Piston, Checking ] Testing and Inspection.

Mark the installed position and cylinder allocation.

The arrow on the piston face points toward the belt pulley side.

Install using a piston ring compressor.

Checking the cylinder bore. Refer to => [ Cylinder Bore, Checking ] Testing and Inspection.

10 Piston Rings

Offset gaps by 120°.

Use piston ring pliers for removal and installation.

The marks face toward the piston crown.

Checking the ring gap. Refer to => [ Piston Ring Gap, Checking ] Testing and Inspection.

Checking the piston ring groove clearance. Refer to => [ Piston Ring Groove Clearance, Checking ] Testing and Inspection.

Bearing Shell Installed Position





Bearing shell - 1 - with a connecting rod oil bore - arrow -.

Bearing shell - 2 - without a connected rod cap oil bore.

- Place bearing shells centrally into the connecting rod and connecting rod cap.

Dimension - a - must be the same on the left and right sides.