Secondary Air Injection Pump Motor, Checking
Secondary Air Injection Pump Motor, Checking
Special tools, testers and auxiliary items required
• Multimeter.
• Wiring diagram.
Test requirements
• The Secondary Air Injection (SAI) Pump Relay (-J299-) and fuse SB-32 is OK.
• The Engine Control Module (ECM) Power Supply Relay (J271) and the Fuel Pump Relay (J17) fuse OK.
• Battery voltage at least 12.5 V.
• All electrical consumers switched off (radiator fan must NOT run during test).
• A/C switched off.
• The ignition switched OFF.
Test procedure
- Perform a preliminary check to verify the customers complaint. Refer to => [ Preliminary Check ] Preliminary Check.
Start diagnosis
- Disconnect the secondary air injection hose.
- Disconnect the Secondary Air Injection (SAI) Pump Motor (-V101-) electrical harness connector.
Checking voltage
• The engine MUST be at ambient temperature and have at least 8 hours off time for the ECM to operate the Secondary Air Injection (SAI) system. Once activated, it will need a complete shutdown cycle again before it will initiate. The SAI system may operate for as little as 10 seconds, up to 55 seconds depending on ambient temperature.
- Ignition switch Off.
- Using a multimeter, check the Secondary Air Injection (SAI) Pump Motor (-V101-) electrical harness connector terminal 2 to ground for voltage. When ready, start the engine while monitoring the reading.
- Start the engine.
Specified value: Battery voltage.
- Switch the ignition OFF.
If the specified value was Not obtained:
- Check the wiring connection from the Secondary Air Injection (SAI) Pump Relay (-J299-) socket 2 (relay terminal 87) through fuse SB-32 to the Secondary Air Injection (SAI) Pump Motor (-V101-) electrical harness connector terminal 2 for an open circuit or a short circuit.
- Check the wiring connections for damage, corrosion, loose or broken terminals or an open fuse. Refer to the Wiring Diagram.
- If necessary, repair the faulty wiring connection, replace fuse if needed.
If the wiring has no fault, the fuse is not open and voltage is Not present at the pump:
- Perform the Secondary Air Injection (SAI) Pump Relay (-J299-) test.
If the specified value was obtained:
Checking Ground
- Using a multimeter, check the Secondary Air Injection (SAI) Pump Motor (-V101-) electrical harness connector terminal 1 to Ground for resistance.
Specified value: 1.5 ohms Max.
If the specified value was Not obtained:
- Check the wiring for an open or high resistance.
- Check the electrical harness connector for damage, corrosion, loose or broken terminals.
- If necessary, repair the faulty wiring connection.
If no malfunction is found in the wiring and voltage supply was OK:
- Replace Secondary Air Injection (SAI) Pump Motor (-V101-).
- Erase the DTC memory. Refer to => [ Diagnostic Mode 04 - Erase DTC Memory ] Diagnostic Modes 01 - 09.
- Perform a road test to verify repair.
Final procedures
After the repair work, the work steps below must be performed in the following sequence:
1. Check the DTC memory. Refer to => [ Diagnostic Mode 03 - Read DTC Memory ] Diagnostic Modes 01 - 09.
2. If necessary, erase the DTC memory. Refer to => [ Diagnostic Mode 04 - Erase DTC Memory ] Diagnostic Modes 01 - 09.
3. If the DTC memory was erased, generate readiness code. Refer to => [ Readiness Code ] Monitors, Trips, Drive Cycles and Readiness Codes.