Operation CHARM: Car repair manuals for everyone.

Turbocharger and Attachments Overview






Turbocharger and Attachments Overview

Various hose connections are secured.

Charge air system must be properly sealed.

Replace the self-locking nuts.

Before installing the oil supply line, fill the turbocharger with engine oil at the supply line connection.

After installing the turbocharger, allow the engine to idle for approximately 1 minute to ensure adequate oil supply to the turbocharger.






1 Bolt

8 Nm

2 Connecting Piece

3 O-ring

Replace if damaged.

4 Bolts

15 Nm

Quantity: 3

5 Heat Shield

6 Gasket

Always replace.

Pay attention to the installed position.

7 Turbocharger

One unit with the exhaust manifold.

Can only be replaced together with the exhaust manifold and vacuum diaphragm.

Removing and installing, refer to => [ Turbocharger ] Turbocharger.

Replacing the vacuum diaphragm with the charge pressure actuator position sensor. Refer to => [ Vacuum Diaphragm with Charge Pressure Actuator Position Sensor G581 ] Vacuum Diaphragm with Charge Pressure Actuator Position Sensor G581.

8 Nut

24 Nm

Always replace.

Quantity: 9

9 Bolt

10 Nm

10 Support

For the turbocharger.

11 Banjo Bolt

Always replace.

60 Nm

12 O-ring

Always replace.

Varying diameters.

13 Bolt

15 Nm

Always replace.

14 Gasket

Always replace.

15 Oil Return Line

16 O-ring

Always replace.

17 Bolt

20 Nm

18 Banjo Bolt

30 Nm

19 Seal

Always replace.

Quantity: 2

20 Oil Supply Line

Tighten the union nuts to 22 Nm.

Check for clearance.

Before installing, fill the turbocharger with engine oil at the oil supply line connection.

21 Bolt

10 Nm

22 Exhaust Gas Recirculation (EGR) Pipe

23 Heat Shield

24 Nut

24 Nm

Always replace.

25 Exhaust Gas Temperature Sensor 1 (G235)

Overview, refer to => [ Exhaust Temperature Control Overview ] Description and Operation.

26 O-ring

Always replace.

27 Pulsation Damper

28 Bolt

9 Nm