Operation CHARM: Car repair manuals for everyone.

Oil Pump Timing Chain Overview






Oil Pump Timing Chain Overview






1 Cylinder Block

2 Guide Rail

Secured to the upper oil pan,

Lubricate before installing the pin.

3 Chain Tensioner

Secure using the locking pin (T10115).

4 Bolt

10 Nm

5 Sprocket, for the Oil Pump

Removing and installing, refer to => [ Oil Pump ] Oil Pump.

6 Timing Chain, for the Oil Pump

From MY 08 the roller chain has been changed to a toothed chain.

Removing:

- Remove the engine.

- Remove the control housing cover.

- Remove the timing chain.

- Remove the chain tensioner => [ (Item 3) Chain Tensioner ].

- Mark the direction of travel.

Note when installing:

- Install in original rotation direction.

- Chain must lie correctly in the tensioning and guide rails.

- Adjust the valve timing. Refer to => [ Valve Timing, Adjusting ] Adjustments.

7 Bolt

20 Nm + 90° (1/4) additional turn.

Always replace.

8 Guide Rail

Lubricate before installing the pin.

9 Bolt

10 Nm

10 Mount

Engages in the groove in the double sprocket => [ (Item 12) Double Sprocket ].

11 Bolt

60 Nm + 90° (1/4)) additional turn.

Always replace.

12 Double Sprocket

Lubricate the journal before installing.

Lubricate the mount => [ (Item 10) Mount ].

13 Gear Shaft

14 Threaded Pin

40 Nm

For the chain tensioner for the timing chain.