Operation CHARM: Car repair manuals for everyone.

Battery, Transceiver, Fuse and Wiring Harness Overview






Battery, Transceiver, Fuse and Wiring Harness Overview






1 - Positive Connection

Red wire with suitable connection.

2 - To Terminal 15a

Connection to terminal 15a.

Ensure that this wire is protected by a fuse.

Fuse maximum 15 amps.

3 - Antenna Ground

Ensure that there is a good ground connection to the body.

The antenna installation location must be treated with suitable corrosion protection.

4 - Transmitting/Receiving Antenna

Installation locations, refer to => [ Transmitted Output, Antenna Installation Locations ] Locations.

5 - Shielded Antenna Wire

Wire with coaxial connector.

6 - Telephone Or Two-Way Radio Transmitter/Receiver Unit

7 - Wiring Harness

Voltage supply positive via red wire, 2.5 mm2 cross section.

Voltage supply negative via brown wire, 2.5 mm2 cross section.

If necessary, wire to terminal 15a via black wire with cross section of 1.5 mm 2.

8 - Fuse Holder

Install next to battery.

9 - To Starter

10 - Battery

Installation location in engine compartment.

11 - Negative Wire

12 - Body Ground