Secondary Air Injection Pump Motor, Checking
Secondary Air Injection Pump Motor, Checking
Special tools, testers and auxiliary items required
• Multimeter.
• Wiring diagram.
Test requirements
• Secondary Air Injection (AIR) Pump Relay (J299) OK.
• Fuel Pump (FP) Relay (J17) OK.
• Battery voltage at least 12.5 V.
• All electrical consumers switched off (radiator fan must NOT run during test).
• A/C switched off.
• The ignition switched off.
Test procedure
- Perform a preliminary check to verify the customers complaint. Refer to => [ Preliminary Check ] Preliminary Check.
Start diagnosis
- Disconnect the secondary air injection hose - arrow -.
- Remove the center noise insulation fasteners - 1, 2, 3, 4 - and the center noise insulation panel.
- Disconnect the Secondary Air Injection (AIR) Pump Motor (V101) electrical harness connector - 3 -.
Checking voltage
- Start engine momentarily.
- Using a Multimeter, check the Secondary Air Injection (AIR) Pump Motor (V101) electrical harness connector terminals 1 to 2 for voltage.
- Switch the ignition off.
Specified value: battery voltage.
If the specified value was not obtained:
- Using a Multimeter, check the Secondary Air Injection (AIR) Pump Motor (V101) electrical harness connector terminal 2 to Ground (GND).
Specified value: battery voltage.
If the specified value was not obtained:
- Check the wiring connection from the Secondary Air Injection (AIR) Pump Relay (J299) socket 2/30 to the Secondary Air Injection (AIR) Pump Motor (V101) electrical harness connector terminal 2 for an open circuit or a short circuit.
- Check the electrical harness connector for damage, corrosion, loose or broken terminals.
- If necessary, repair the faulty wiring connection.
If the specified value was obtained:
Checking Ground (GND)
- Using a Multimeter, check the Secondary Air Injection (AIR) Pump Motor (V101) electrical harness connector terminal 1 to Ground (GND) connection 2 (on left front long member) for resistance.
Specified value: 1.5 ohms Max.
If the specification was not obtained:
- Check the Secondary Air Injection (AIR) Pump Motor (V101) electrical harness connector terminal 1 to Ground (GND) connection 2 (on left front long member) for a short circuit to each other, Battery (+), and Ground (GND).
- Check the electrical harness connector for damage, corrosion, loose or broken terminals.
- If necessary, repair the faulty wiring connection.
If no malfunction is found in the wiring and voltage supply was OK:
- Replace Secondary Air Injection (AIR) Pump Motor (V101). Refer to Engine Mechanical Repair Information
- Erase the DTC memory. Refer to => [ Diagnostic Mode 04 - Erase DTC Memory ] Diagnostic Mode 04 - Erase DTC Memory.
- Perform a road test to verify repair.
If the DTC does not return:
Repair complete, Generate readiness code. Refer to => [ Readiness Code ] Readiness Code.
- End diagnosis.
If the DTC does return and no malfunction is detected in the wiring and the voltage supply was not OK:
- Replace the Secondary Air Injection (AIR) Pump Relay (J299).
- Assembly is performed in the reverse of the removal.
Final procedures
After repair work, the following work steps must be performed in the following sequence:
1. Check the DTC memory. Refer to => [ Diagnostic Mode 03 - Read DTC Memory ] Diagnostic Mode 03 - Read DTC Memory.
2. If necessary, erase the DTC memory. Refer to => [ Diagnostic Mode 04 - Erase DTC Memory ] Diagnostic Mode 04 - Erase DTC Memory.
3. If the DTC memory was erased, generate readiness code. Refer to => [ Readiness Code ] Readiness Code.
End of diagnosis.