Operation CHARM: Car repair manuals for everyone.

Intake Manifold Assembly Overview






Intake Manifold Assembly Overview





1 Intake manifold lower part

Removing and installing => [ Intake Manifold Lower Section ] Intake Manifold Lower Section

2 9 Nm

3 Gasket

Replace

4 Fuel rail

Removing and installing

5 9 Nm

6 Oil seal

Replace

7 22 Nm

8 Intake manifold side part

Left intake manifold side part, removing and installing => [ Left Intake Manifold Side ] Left Intake Manifold Side

Right intake manifold side part, removing and installing => [ Right Intake Manifold Side ] Right Intake Manifold Side

9 Gasket

Replace

10 7 Nm plus 1/2 turn (180°)

Replace

Starting from middle, tighten in stages and in diagonal sequence

11 Intake manifold upper part

Removing and installing => [ Intake Manifold Upper Section ] Multiport Fuel Injection

12 Vacuum hose

To fuel pressure regulator

13 Vacuum hose

To Evaporative Emission (EVAP) canister purge regulator valve 2 (-N333-)

14 Vacuum hose

To brake booster

15 9 Nm

16 Throttle valve control module

Cylinder bank 1 (right): Throttle valve control module (-J338-)

Cylinder bank 2 (left): Throttle Valve Control Module 2 (-J544-)

17 Gasket

Replace

18 Pressure regulator valve for crankshaft housing ventilation

With oil separator

19 9 Nm

20 O-ring

Replace

To install, moisten with fuel

Do not use lubricants containing silicone

21 Gasket

Replace

Press into cylinder head