Left and Right Timing Chain Covers
Left and Right Timing Chain Covers
Special tools, testers and auxiliary items required
• Hand drill with plastic brush attachment
• Protective eyewear
• Sealant
Removing
• Engine/transmission assembly removed and mounted on Scissor Lift Platform (VAS 6131 A).
• During installation, reinstall all heat insulation sleeves and heat shields at the same locations.
• All cable ties opened or cut during engine removal must be reinstalled at the same locations during installation.
- Remove bolts - 2 - and - 3 - and remove oil dipstick guide tube upward.
- Remove the bolts - 4 - and - 5 -.
- Slide heat insulation sleeve over left coolant connection hose to side.
- Loosen hose clips - 1 - and - 7 -.
- Remove left coolant pipe from coolant hoses.
• Ignore - 6 -.
- Remove bolts - 1 - and - 2 -.
- Lay aside air guide pipe to secondary air injection combination valves.
• Ignore - 3 -.
- Remove bolts - 3 - and - 4 -.
- Slide heat insulation sleeve over right coolant connection hose to side.
- Loosen hose clamp - 1 -.
- Remove right coolant pipe from coolant connection hose.
• Ignore - 2 - and - 5 -.
- Remove nuts - 2 - and remove wiring harness bracket from rear coolant pipe.
- Disconnect electrical connector - 3 - on Engine Coolant Temperature (ECT) Sensor (G62).
- Remove electrical connectors - 1 - and - 4 - from bracket at rear coolant pipe.
- Remove bolts - 1 to 4 -.
- Remove rear coolant pipe and secondary air injection combination valves.
- Remove the bolts - 1 through 8 - and then carefully remove the left cover for the timing chain from the bond.
- Remove the bolts - 1 through 8 - and then carefully remove the right cover for the timing chain from the bond.
Installing
• Replace O-rings.
• Secure all hose connections with hose clamps appropriate for the model.
• During installation, reinstall all heat insulation sleeves and heat shields at the same locations.
• During installation, all cable ties must be re-installed at the same location.
CAUTION!
Wear safety glasses.
- Remove sealant residue on timing chain covers and cylinder head, for example, with a rotating plastic brush.
CAUTION!
Make sure that no sealant residue enters the engine.
- Clean the sealing surfaces, they must be free of oil and grease.
• Note the expiration date of the sealing compound.
- Cut tube nozzle at front marking (nozzle dia. approximately 2 mm).
- Drive left coolant intermediate pipe - 2 - out of left timing chain cover with a suitable drift.
- Replace O-rings - 1 - at coolant intermediate pipe.
- Insert coolant intermediate pipe in left timing chain cover.
- Apply sealant bead - arrow - on clean sealing surfaces of left timing chain cover, as shown in illustration.
• Thickness of sealant bead: 2.5 mm.
• Covers for timing chain must be installed within 5 minutes after applying sealant.
- Position left timing chain cover and tighten bolts in sequence - 1 to 8 -.
- Drive right coolant intermediate pipe - 2 - out of right timing chain cover with a suitable drift.
- Replace O-rings - 1 - at coolant intermediate pipe.
- Insert coolant intermediate pipe in right timing chain cover.
- Apply sealant bead - arrows - on clean sealing surfaces of right timing chain cover, as shown in illustration.
• Thickness of sealant bead: 2.5 mm.
- Position right timing chain cover and tighten bolts in sequence - 1 to 8 -.
The rest of the installation is in reverse order of removal, note the following:
- Install combination valve for Secondary Air Injection (AIR) system. Refer to: Left => [ Left Combination Valve for Secondary Air Injection ] Left Combination Valve for Secondary Air Injection, right => [ Right Combination Valve for Secondary Air Injection ] Right Combination Valve for Secondary Air Injection.
- Install rear coolant pipe. Refer to => [ Rear Coolant Pipe ] Rear Coolant Pipe.
- Install left coolant pipe. Refer to => [ Left Coolant Pipe, ] Left Coolant Pipe.
- Install right coolant pipe. Refer to => [ Right Coolant Pipe ] Right Coolant Pipe.
Tightening specifications. Refer to => [ Timing Chain Covers Assembly Overview ] Timing Chain Covers Assembly Overview