Operation CHARM: Car repair manuals for everyone.

Left and Right Timing Chain Covers






Left and Right Timing Chain Covers

Special tools, testers and auxiliary items required

Hose Clip Pliers (VAS 6362)

Hand drill with plastic brush attachment

Protective eyewear

Sealant

Removing

Engine/transmission assembly removed and mounted on scissor lift platform (VAS 6131 A).

During installation, reinstall all heat insulation sleeves and heat shields at the same locations.

All cable ties opened or cut during engine removal must be reinstalled at the same locations during installation.

- Remove the bolts - 2 - and - 3 -.





- Pull the oil dipstick guide tube upward and off - arrow -.

- Loosen hose clamps - 1 - and - 4 - and remove left coolant pipe from coolant hoses.

- Remove the bolts - 2 - and - 3 -.





- Loosen hose clamps - 1, 4, 5 - and remove right coolant pipe from coolant hoses.

- Remove nuts - 2 - and - 4 - and remove connector bracket from rear coolant pipe.





- Free up engine wiring harness on rear coolant pipe.

- Disconnect electrical connector - 3 - on engine coolant temperature sensor (G62).

- Disconnect coolant hose - 5 - from rear coolant pipe.

- Remove the bolts - 1 - and - 6 - and then remove rear coolant pipe.

- Remove the bolts - 1 through 8 - and then carefully remove the left cover for the timing chain from the bond.





- Remove the bolts - 1 through 8 - and then carefully remove the right cover for the timing chain from the bond.





Installing

Replace O-rings.

Secure all hose connections with hose clamps appropriate for the model.

During installation, reinstall all heat insulation sleeves and heat shields at the same locations.

During installation, all cable ties must be installed at the same location.

CAUTION!
Wear safety glasses.

- Remove sealant residue on timing chain covers and cylinder head, for example, with a rotating plastic brush.





CAUTION!
Make sure that no sealant residue enters the engine.

- Clean the sealing surfaces, they must be free of oil and grease.

Note the expiration date of the sealing compound.

- Cut tube nozzle at front marking (nozzle diameter approximately 2 mm).





- Drive left coolant intermediate pipe - 2 - out of left timing chain cover with a suitable drift.





- Replace O-rings - 1 - at coolant intermediate pipe - 2 -.

- Insert coolant intermediate pipe in left timing chain cover.

- Apply sealant bead - arrow - on clean sealing surfaces of left timing chain cover, as shown in illustration.

Sealant bead thickness: 2.5 mm

Covers for timing chain must be installed within 5 minutes after applying sealant.

- Position left timing chain cover and tighten bolts in sequence - 1 to 8 -.





- Drive right coolant intermediate pipe - 2 - out of right timing chain cover with a suitable drift.





- Replace O-rings - 1 - at coolant intermediate pipe - 2 -.

- Insert coolant intermediate pipe in right timing chain cover.

- Apply sealant bead - arrows - on clean sealing surfaces of right timing chain cover, as shown in illustration.

Sealant bead thickness: 2.5 mm

- Position right timing chain cover and tighten screws in sequence - 1 to 8 -.





The rest of installation is in reverse order of removal, note the following:

- Install rear coolant pipe. Refer to => [ Rear Coolant Pipe ] Rear Coolant Pipe.

- Install left coolant pipe. Refer to => [ Left Coolant Pipe ] Left Coolant Pipe.

- Install right coolant pipe. Refer to => [ Right Coolant Pipe ] Right Coolant Pipe.

Tightening Specifications