Guide Frame Tightening Sequence
Guide Frame Tightening Sequence
- Replace bolts - 1 to 20 -.
- Tighten bolts in 7 stages as follows:
- Tighten bolts - 1 to 10 - to 30 Nm.
- Tighten bolts - 11 to 20 - to 20 Nm.
- Tighten bolts - 1 to 10 - to 50 Nm.
- Tighten bolts - 11 to 20 - to 30 Nm.
- Tighten bolts - 1 to 10 - an additional 90° (1/4 turn).
- Tighten bolts - 11 to 20 - an additional 90° (1/4 turn).
- Tighten guide frame to cylinder block sealing surface bolts, - highlighted in illustration but not numbered -, in a diagonal sequence to 9 Nm.