Power Take-Off Drive Chain
Power Take-Off Drive Chain
Special tools, testers and auxiliary items required
• Locking Pin (T40071)
Removing
• The transmission is removed.
- Remove timing chain lower cover => [ Lower Timing Chain Cover ] Lower Timing Chain Cover.
Risk of destroying due to reversed running direction on a used drive chain.
• Paint arrows to mark the power take-off drive chain running direction so it can be installed again.
- Press the tensioning rail in the direction of the - arrow - and secure it with a (T40071).
- Remove the bolt - 1 - and remove the idler sprocket.
• Pay attention to the compression spring when removing => [ (Item 4) Pressure Spring ] Power Take-Off Drive Chain Overview.
- Remove the bolts - 2, 3 and 4 - and the chain tensioner.
- Remove the power take-off drive chain.
Installing
Install in reverse order, paying attention to the following:
• For the correct tightening specifications, refer to => [ Power Take-Off Drive Chain Overview ] Power Take-Off Drive Chain Overview.
• Replace the gasket.
• Secure all hose connections with hose clamps of the same type as those equipped by the factory, refer to the Electronic Parts Catalog (ETKA)
- Install timing chain lower cover. Refer to => [ Lower Timing Chain Cover ] Lower Timing Chain Cover.