Operation CHARM: Car repair manuals for everyone.

Generator Replacement (LC3)




Generator Replacement (LC3)

Removal Procedure
Warning: Refer to Battery Disconnect Warning (Service Precautions).


1. Remove the generator drive belt. Refer to Drive Belt Removal (Overhaul).
2. Disconnect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection (Service and Repair).
3. Drain the cooling system. Refer to Cooling System Draining and Filling (Static Fill) (Service and Repair)Cooling System Draining and Filling (GE 47716) (Service and Repair).
4. Remove the front suspension crossmember. Refer to Front Suspension Crossmember Replacement ().




5. Remove the bolt from the generator coolant hose assembly on the generator.
6. Disconnect the generator coolant hose assembly from the generator port.




7. Disconnect the generator electrical connector (1).




8. Remove the starter cable terminal from the generator:

1. Slide the boot (1) back along the cable.
2. Remove the starter cable nut (2).
3. Remove the starter cable terminal (3) from the stud (4).




9. Remove the upper generator bolt from the generator.




10. Remove the idler pulley thru-bolt (1).
11. Remove the idler pulley nut (2).
12. Remove the idler pulley assembly (3).
13. Remove the generator (4).

Installation Procedure




1. Install the generator.





Caution: Refer to Fastener Caution (Fastener Caution).

2. Install the upper generator bolt and tighten to 50 Nm (37 lb ft).




3. Install the idler pulley assembly (3) and bolt (1).
4. Install the nut (2).
Tighten the generator fasteners to the following torque values:

1. Tighten the idler pulley bolt (1) to 50 Nm (37 lb ft).
2. Tighten the idler pulley nut (2) to 50 Nm (37 lb ft).




5. Install the starter cable terminal to the generator:

1. Install the starter cable terminal to the stud.
2. Install the starter cable nut (2) and tighten to 20 Nm (15 lb ft).
3. Slide the boot (1) over the generator stud (4).

6. Position the generator coolant hose assembly to the generator and secure with the bolt and tighten to 27 Nm (20 lb ft).




7. Connect the generator electrical connector (1).
8. Install the front suspension crossmember. Refer to Front Suspension Crossmember Replacement ().
9. Fill the cooling system. Refer to Cooling System Draining and Filling (Static Fill) (Service and Repair)Cooling System Draining and Filling (GE 47716) (Service and Repair).
10. Connect the negative battery cable (2). Refer to Battery Negative Cable Disconnection and Connection (Service and Repair).
11. Install the generator drive belt. Refer to Drive Belt Removal (Overhaul).