Operation CHARM: Car repair manuals for everyone.

Test E: The Demand Lamps Are Inoperative

PINPOINT TEST E: THE DEMAND LAMPS ARE INOPERATIVE


E1-E3:






Normal Operation
The smart junction box (SJB) supplies voltage to the demand lamps on circuit CLN01 (GN/VT). The demand lamps are grounded through circuit GD133 (BK) or circuit GD149 (BK/GY).

Possible Causes
- Fuse
- Circuit CLN01 (GN/VT) open or short to ground
- SJB