Test B: The Instrument Cluster Illumination Is Inoperative
PINPOINT TEST B: THE INSTRUMENT CLUSTER ILLUMINATION IS INOPERATIVEB1-B3:
Normal Operation
Variable voltage is supplied to the instrument cluster on circuit 19 (LB/RD). The instrument cluster is grounded by circuit 57 (BK).
Possible Causes
- Circuit 19 (LB/RD) open
- Circuit 57 (BK) open
- Instrument cluster