Generator - Dual Generator
Generator - 6.4L Diesel, Dual Generator
Removal and Installation
NOTE: This procedure applies to the primary (lower) and/or secondary (upper) generator of the dual generator system.
Both generators
1. Disconnect the batteries. For additional information, refer to Battery.
2. Remove the Air Cleaner (ACL) assembly. For additional information, refer to Fuel Delivery and Air Induction.
Primary generator
3. Remove the fender splash shield.
Secondary generator
4. Loosen the RH Charge Air Cooler (CAC) tube clamp at the intake throttle adapter and position the CAC tube aside.
- To install, tighten to 8 Nm (71 lb-in).
Both generators
5. Rotate the accessory drive belt tensioner clockwise and remove the drive belt from the generator pulley.
6. Remove the nut(s) and position the generator B+ terminal(s) aside.
- To install, tighten to 17 Nm (150 lb-in).
7. Disconnect the generator electrical connector.
8. Remove the 2 lower bolts to the generator.
- To install, tighten to 47 Nm (35 lb-ft).
9. Remove the upper bolt and the generator.
- To install, tighten to 47 Nm (35 lb-ft).
10. To install, reverse the removal procedure.