Operation CHARM: Car repair manuals for everyone.

Pinpoint Test G: The Door Lock Control Switch Illumination Is Inoperative




Instrument Cluster and Panel Illumination

Pinpoint Test

Pinpoint Test G: The Door Lock Control Switch Illumination Is Inoperative

Refer to Wiring Diagram Set 71, Cluster and Panel Illumination for schematic and connector information. Diagrams By Number

Normal Operation

The Smart Junction Box (SJB) provides voltage to the LH and RH door lock control switches when the key is in the RUN or ACC position.

This pinpoint test is intended to diagnose the following:

- Wiring, terminals or connectors
- Door lock control switch



PINPOINT TEST G: THE DOOR LOCK CONTROL SWITCH ILLUMINATION IS INOPERATIVE

NOTICE: Use the correct probe adapter(s) when making measurements. Failure to use the correct probe adapter(s) may damage the connector.

-------------------------------------------------
G1 CHECK FOR VOLTAGE TO THE DOOR LOCK CONTROL SWITCH


- Ignition OFF.
- Disconnect: LH Door Lock Control Switch C505 or RH Door Lock Control Switch C605.
- Ignition ON.
- Measure the voltage between the LH door lock control switch C505-2, circuit CBP06 (WH/BU), harness side or the RH door lock control switch C605-2, circuit CBP06 (WH/BU), harness side and ground.




- Is the voltage greater than 10 volts?

Yes
INSTALL a new door lock control switch. TEST the system for normal operation.

No
REPAIR circuit CBP06 (WH/BU) for an open. TEST the system for normal operation.

-------------------------------------------------