Installation
Transmission
This is a "Trustmark Authoring Standards (TAS) Repair Procedure"
- TAS style procedures can be identified by steps that have no accompanying step text and the magenta color of the electrical connectors and fasteners such as nuts, bolts, clamps or clips.
- TAS removal and installation procedures use a sequence of color illustrations to indicate the order to be followed when removing/disassembling or installing/assembling a component.
- Many of the TAS procedures will have the installation information within the removal steps.
- The TAS color illustrations use a variety of symbols to indicate important details of the procedures. It is important to understand these symbols in order to properly used the TAS procedures.
Refer to How to Use TAS Procedures and TAS Symbol Glossary at Vehicle | Description and Operation for additional information on these TAS procedures.
For additional information, refer to How to Use TAS Procedures How to Use TAS Procedures
1 Install the TCM.
Torque to: 24 Nm
2 Install the transmission selector lever.
Torque to: 13 Nm
3 Install the transmission fluid cooler.
Torque to: 10 Nm
4 Remove the torque converter retainer.
CAUTION: Make sure that the torque converter remains in the transmission.
CAUTION: Make sure that the component is correctly located on the locating dowels.
CAUTION: Make sure that the mating faces are clean and free of corrosion and foreign material.
NOTE:
This step requires the aid of another technician.
5 Install the transmission and converter.
6 Install the transmission retaining bolts.
Torque to: 47 Nm
7 Remove the transmission support.
E70 - Powertrain Jack
8 Install the engine mount bracket.
Torque to: 90 Nm
9 Install the engine mount LH.
Torque to: 175 Nm
WARNING: Make sure that new nuts are installed.
10 Install the bracket.
M12: 80 Nm
M8: 25 Nm
11 Remove the engine support.
12 Secure and connect the selector lever cable.
13 Install the transmission oil cooler.
14 Connect the transmission fluid cooler coolant hoses.
15 Install the power steering pump.
Torque to: 25 Nm
16 Install the coolant pump inlet pipe.
Torque to: 10 Nm
17 Attach the flexplate.
Torque to: 47 Nm
18 Install the access cover.
Torque to: 10 Nm
19 Remove the crankshaft locking tool.
CAUTION: Make sure that the mating faces are clean and free of foreign material.
NOTE:
This step requires the aid of another technician.
20 Install the power transfer unit.
Torque to: 65 Nm
21 Install the power transfer unit support bracket.
Torque to: 65 Nm
22 Install both the halfshafts.
23 Install the RH halfshaft support.
Torque to: 25 Nm
CAUTION: Make sure that new bolts are installed.
Step 1: 45 Nm
Step 2: 80 degree
24 Install the crankshaft front oil seal.
For additional information, refer to Engine Front Seal Engine Front Seal
25 Install the front subframe.
For additional information, refer to Front Subframe
26 Install the accessory drive pulley.
For additional information, refer to Accessory Drive Pulley Accessory Drive Pulley
27 Install the starter motor.
For additional information, refer to Starter Motor - Petrol Service and Repair
28 Connect the battery ground cable and install the cover.
For additional information, refer to Specifications Specifications
29 Fill and bleed the cooling system.
For additional information, refer to Cooling System Draining, Filling and Bleeding Service and Repair
30 Refill the transmission with fluid.
For additional information, refer to Transmission Fluid Drain and Refill - 3.2L Transmission Fluid Drain and Refill
31 If a new component is to be installed, configure using Land Rover approved diagnostic equipment.
NOTE:
For NAS vehicles only.
32 If fitting new or exchange components, carry out long drive cycle.
For additional information, refer to Powertrain Control Module (PCM) Long Drive Cycle Self-Test Powertrain Control Module (PCM) Long Drive Cycle Self-Test