Installation
AIR CONDITIONING: CENTER CLUSTER INTEGRATION SWITCH:
INSTALLATION
1. INSTALL CENTER CLUSTER INTEGRATION SWITCH
(a) Install the connector.
(b) Install the center cluster integration switch with the 2 bolts.
2. INSTALL RADIO AND RECEIVER ASSEMBLY WITH BRACKET Installation
3. INSTALL INSTRUMENT PANEL FINISH PANEL LOWER Installation
4. INSTALL CONSOLE PANEL UPPER FRONT Installation