Operation CHARM: Car repair manuals for everyone.

Installation





1UR-FE INTAKE / EXHAUST: INTAKE MANIFOLD: INSTALLATION

1. INSTALL THROTTLE BODY ASSEMBLY

(a) Align the protrusion of a new gasket with the groove of the intake manifold and install the gasket.





Text in Illustration





(b) Install the throttle body with the 4 bolts.

Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

2. INSTALL MANIFOLD ABSOLUTE PRESSURE SENSOR Installation

3. INSTALL PURGE VSV

(a) Connect the purge line hose to the intake manifold.

(b) Install the purge VSV to the intake manifold with the bolt.

Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)

4. INSTALL VACUUM SWITCHING VALVE ASSEMBLY (for ACIS)

(a) Install the vacuum switching valve to the intake manifold with the bolt.

Torque : 9.0 Nm (92 kgf-cm, 80 in-lbf)

(b) Connect the 2 vacuum hoses to the vacuum switching valve.

5. INSTALL STUD BOLT

(a) Using an E5 "TORX" socket wrench, install the 2 stud bolts to the intake manifold.

Torque : 5.0 Nm (51 kgf-cm, 44 in-lbf)

6. INSTALL V-BANK COVER PIN

(a) Install the V-bank cover pin to the intake manifold.

Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

7. INSTALL V-BANK COVER BRACKET

(a) Install the V-bank cover bracket to the intake manifold with the 2 bolts.

Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

8. INSTALL FUEL TUBE SUB-ASSEMBLY

(a) Install the 2 wire harness brackets to the intake manifold with the 2 bolts.

Torque : 8.0 Nm (82 kgf-cm, 71 in-lbf)

(b) Install the fuel tube to the intake manifold with the bolt.

Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

9. INSTALL INTAKE MANIFOLD

(a) Place 2 new gaskets on the intake manifold.





(b) Place the intake manifold on the cylinder head.

(c) Install and uniformly tighten the 8 bolts and 2 nuts in several steps.

Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)

(d) Connect the fuel tube to the No. 2 fuel delivery pipe Service Precautions.

(e) Connect the fuel tube to the fuel delivery pipe Service Precautions.

(f) Attach the 3 wire harness clamps to the 3 wire harness brackets.





(g) Connect the wire harness to the wire harness bracket with the nut.

Torque : 8.0 Nm (82 kgf-cm, 71 in-lbf)

(h) Connect the purge VSV connector.

(i) Connect the purge line hose to the purge VSV.

(j) Connect the vacuum switching valve connector (for ACIS).

(k) Connect the PCV valve hose.

(l) Connect the No. 4 water by-pass hose.

(m) Connect the throttle body connector.

10. INSTALL AIR TUBE SUB-ASSEMBLY





Text in Illustration





(a) Temporarily install the air tube with the 5 bolts.

(b) Connect the No. 2 air injection system hose to the air switching valve LH as shown in the illustration.

(c) Connect the manifold absolute pressure sensor connector and clamp.

(d) Attach the 2 wire harness clamps.

(e) Connect the No. 1 air injection system hose to the air switching valve RH as shown in the illustration.

(f) Connect the air hose to the air pump as shown in the illustration.

(g) Tighten the 5 bolts.

Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

11. INSTALL RADIATOR RESERVOIR ASSEMBLY Installation

12. INSTALL VENTILATION HOSE ASSEMBLY

(a) Install the ventilation hose with the bolt.

Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

(b) Connect the ventilation hose to the ventilation pipe of the cylinder head cover LH and RH.

13. CONNECT NO. 4 WATER BY-PASS PIPE

(a) Connect the No. 4 water by-pass pipe with the 2 bolts.

Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

14. INSTALL WATER PIPE AND HOSE SUB-ASSEMBLY (for Single Air Conditioning System) Installation

15. INSTALL WATER PIPE AND HOSE SUB-ASSEMBLY (for Dual Air Conditioning System) Installation

16. INSTALL COWL TOP VENTILATOR LOUVER SUB-ASSEMBLY

(a) Install the cowl top ventilator louver Installation.

17. INSTALL EGR VALVE ASSEMBLY

(a) Install the EGR valve Installation.

18. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.

19. CHECK FOR FUEL LEAK Installation

20. CHECK THROTTLE BODY ASSEMBLY Installation

21. INSTALL ENGINE ROOM SIDE COVER Installation

22. INSTALL ENGINE ROOM SIDE COVER LH Installation