Installation
1UR-FE BATTERY / CHARGING: GENERATOR: INSTALLATION
1. INSTALL GENERATOR ASSEMBLY
(a) Install the generator with the 3 bolts and nut.
Torque : 43 Nm (438 kgf-cm, 32 ft-lbf)
(b) Connect the wire harness bracket to the generator with the bolt.
Torque : 24 Nm (245 kgf-cm, 18 ft-lbf)
(c) Attach the generator wire.
(d) Connect the generator wire with the nut.
Torque : 9.8 Nm (100 kgf-cm, 87 in-lbf)
(e) Install the terminal cap.
(f) Connect the generator connector.
(g) Connect the No. 2 return tube bracket with the bolt.
Torque : 28 Nm (286 kgf-cm, 21 ft-lbf)
2. CONNECT VANE PUMP ASSEMBLY
(a) Connect the vane pump with the 2 bolts.
Torque : 43 Nm (438 kgf-cm, 32 ft-lbf)
(b) Attach the clamp and connect the connector.
3. INSTALL FRONT FENDER APRON SEAL RH Installation
4. INSTALL AIR CLEANER CASE SUB-ASSEMBLY Installation
5. INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY
6. INSTALL AIR CLEANER CAP AND HOSE Installation
7. INSTALL RADIATOR ASSEMBLY
(a) Install the radiator assembly Installation.
8. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.