Operation CHARM: Car repair manuals for everyone.

Removal








2UR-FSE ENGINE CONTROL SYSTEM: CAMSHAFT OIL CONTROL VALVE: REMOVAL

REMOVAL
HINT: When viewed from the rear of the engine assembly, Bank 1 is on the left side and Bank 2 is on the right side.

1. REMOVE V-BANK COVER SUB-ASSEMBLY Removal
2. REMOVE AIR CLEANER INLET COVER SUB-ASSEMBLY Removal
3. REMOVE NO. 1 AIR CLEANER INLET Removal





4. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 1)
(a) Disconnect the oil control valve connector.
(b) Remove the bolt and oil control valve.
(c) Remove the O-ring from the oil control valve.





5. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 2)
(a) Disconnect the oil control valve connector.
(b) Remove the bolt and oil control valve.
(c) Remove the O-ring from the oil control valve.