Footwell Light Circuit
LIGHTING (INT): LIGHTING SYSTEM: Footwell Light Circuit
- Footwell Light Circuit
DESCRIPTION
The main body ECU (multiplex network ECU) controls the footwell lights.
WIRING DIAGRAM
INSPECTION PROCEDURE
PROCEDURE
1. PERFORM ACTIVE TEST USING TECHSTREAM
(a) Connect the Techstream to the DLC3.
(b) Turn the power switch on (IG).
(c) Turn the Techstream on.
(d) Enter the following menus: Body Electrical / Main Body / Active Test.
(e) Check that the footwell lights come on.
Main Body
OK:
Footwell lights come on.
NG -- CHECK HARNESS AND CONNECTOR (INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY - BATTERY)
OK -- PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE
2. CHECK HARNESS AND CONNECTOR (INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY - BATTERY)
(a) Disconnect the 2B instrument panel junction block assembly connector.
(b) Measure the voltage according to the value(s) in the table below.
Standard Voltage:
Text in Illustration
NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- Continue to next step.
3. INSPECT INSTRUMENT PANEL JUNCTION
BLOCK ASSEMBLY
(a) Remove the instrument panel junction block assembly.
(b) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Text in Illustration
NG -- REPLACE INSTRUMENT PANEL JUNCTION
BLOCK ASSEMBLY
OK -- REPLACE MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU) Service and Repair