Start / Stop Switch: Testing and Inspection
2GR-FE STARTING: ENGINE SWITCH: INSPECTION
1. INSPECT ENGINE SWITCH
(a) Measure the resistance according to the value(s) in the table below.
Standard resistance:
If the result is not as specified, replace the engine switch.
(b) Apply battery voltage between the terminals of the switch, and check the illumination condition of the switch.
Standard resistance:
If the result is not as specified, replace the engine switch.