Operation CHARM: Car repair manuals for everyone.

Installation





2AZ-FXE COOLING: THERMOSTAT: INSTALLATION

1. INSTALL THERMOSTAT

(a) Install a new gasket onto the thermostat.

(b) Install the thermostat with the jiggle valve facing upward.





Text in Illustration





HINT
The jiggle valve may be set to within 10° on either side of the prescribed position.

2. INSTALL WATER INLET

(a) Install the water inlet with the 2 nuts.

Torque : 9.0 Nm (92 kgf-cm, 80 in-lbf)

3. CONNECT NO. 2 RADIATOR HOSE Installation

4. ADD COOLANT (for Engine) Service and Repair

5. INSPECT FOR COOLANT LEAK (for Engine) Testing and Inspection

6. INSTALL NO. 1 ENGINE UNDER COVER