Installation
2GR-FSE STARTING: STARTER: INSTALLATION
1. INSTALL STARTER ASSEMBLY
(a) Install the starter with the 2 bolts.
Torque : 58 Nm (591 kgf-cm, 43 ft-lbf)
(b) Connect the wire harness to terminal 30 and install the nut, and then attach the terminal cap.
Torque : 9.8 Nm (100 kgf-cm, 87 in-lbf)
(c) Connect the terminal 50 connector to the starter assembly.
2. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY LH
HINT
Installation.
3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
4. INSPECT FOR EXHAUST GAS LEAK