Removal
2UR-GSE LUBRICATION: SCAVENGING PUMP: REMOVAL
1. REMOVE TIMING CHAIN COVER SUB-ASSEMBLY
HINT
Removal
2. REMOVE NO. 1 OIL PIPE
(a) Remove the 2 bolts and No. 1 oil pipe.
(b) Remove the oil pipe seal and O-ring from the No. 1 oil pipe.
3. REMOVE NO. 2 OIL PIPE
(a) Remove the 2 bolts and No. 2 oil pipe.
(b) Remove the oil pipe seal and O-ring from the No. 2 oil pipe.
4. REMOVE NO. 3 OIL PIPE
(a) Remove the 2 bolts and No. 3 oil pipe.
(b) Remove the O-ring from the No. 3 oil pipe.
5. REMOVE SCAVENGING PUMP ASSEMBLY
(a) Remove the 6 bolts, scavenging pump assembly and gasket.