Installation
2UR-GSE BATTERY / CHARGING: GENERATOR: INSTALLATION
1. INSTALL GENERATOR
(a) Using an E8 "TORX" socket wrench, set the generator with the 2 stud bolts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(b) Install the generator with the 2 bolts and 2 nuts.
Torque : 43 Nm (438 kgf-cm, 32 ft-lbf)
(c) Install the wire harness bracket with the nut.
Torque : 6.0 Nm (61 kgf-cm, 53 in-lbf)
(d) Connect the harness to the +B terminal with nut A.
Torque : 12 Nm (122 kgf-cm, 9 ft-lbf)
(e) Install the oil cooler tube with bolt B.
Torque : 14 Nm (140 kgf-cm, 10 ft-lbf)
(f) Connect wire harness clamp C.
(g) Connect generator connector D.
2. INSTALL FRONT STABILIZER BAR
(a) Install the front stabilizer bar Installation.
3. INSTALL WIRE HARNESS
(a) Connect the wire harness with the bolt and clamp.
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)
4. INSTALL V-RIBBED BELT Installation
5. INSTALL RADIATOR RESERVE TANK ASSEMBLY Installation
6. INSTALL AIR CLEANER CASE SUB-ASSEMBLY Installation
7. INSTALL AIR CLEANER CAP SUB-ASSEMBLY Installation
8. INSTALL NO. 1 AIR CLEANER INLET Installation
9. INSTALL REAR ENGINE UNDER COVER LH
10. INSTALL REAR ENGINE UNDER COVER RH
11. INSTALL ENGINE UNDER COVER
12. INSTALL ENGINE ROOM SIDE COVER RH Installation
13. INSTALL COOL AIR INTAKE DUCT SEAL Installation
14. INSTALL FRONT WHEELS
15. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.