Installation
2UR-GSE STARTING: STARTER: INSTALLATION
1. INSTALL STARTER ASSEMBLY
(a) Install the flywheel housing side cover.
(b) Install the terminal lower cover with the nut.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(c) Install the starter assembly with the 2 bolts.
Torque : 37 Nm (377 kgf-cm, 27 ft-lbf)
NOTICE:
Make sure that the flywheel housing cover is as shown in the illustration.
(d) Install the wire harness with the nut.
Torque : 9.8 Nm (100 kgf-cm, 87 in-lbf)
(e) Connect the starter connector.
(f) Install the terminal upper cover with the 11 claws.
2. INSTALL NO. 3 EXHAUST MANIFOLD HEAT INSULATOR
(a) Install the No. 3 exhaust manifold heat insulator with the 3 bolts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
3. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY RH Installation
4. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR Installation
5. INSTALL OIL LEVEL DIPSTICK GUIDE SUB-ASSEMBLY Installation
6. INSTALL OIL LEVEL DIPSTICK SUB-ASSEMBLY Installation
7. INSTALL ENGINE AND TRANSMISSION
Installation.