Installation
2ZR-FXE INTAKE / EXHAUST: INTAKE MANIFOLD: INSTALLATION
1. INSTALL INTAKE MANIFOLD
(a) Install a new No. 1 intake manifold to head gasket to the intake manifold.
(b) Install the intake manifold with the 2 bolts and 2 nuts.
Torque : 28 Nm (285 kgf-cm, 21 ft-lbf)
(c) Connect the fuel vapor feed hose and ventilation hose.
(d) Install a new O-ring to the engine oil level dipstick guide sub-assembly.
(e) Apply a light coat of engine oil to the O-ring.
(f) Install the engine oil level dipstick guide sub-assembly with the 2 bolts and connect the wire harness clamp.
Bolt (A) - Torque : 28 Nm (285 kgf-cm, 21 ft-lbf)
Bolt (B) - Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)
(g) Install the engine oil level dipstick.
(h) Connect the 2 wire harness clamps and 3 connectors.
2. INSTALL PURGE VSV Installation
3. INSTALL MANIFOLD ABSOLUTE PRESSURE SENSOR Installation
4. INSTALL EGR PIPE ASSEMBLY Installation
5. INSTALL THROTTLE BODY ASSEMBLY
Installation