Operation CHARM: Car repair manuals for everyone.

Installation





HEATING / AIR CONDITIONING: AIR CONDITIONING PANEL: INSTALLATION

1. INSTALL CENTER CLUSTER MODULE CIRCUIT

(a) Engage the 2 guides and install the center cluster module circuit.

2. INSTALL LOWER HEATER CONTROL BASE

(a) Install the lower heater control base with the 8 screws.

3. INSTALL AIR CONDITIONING CONTROL ASSEMBLY

(a) Connect the connector.

(b) Engage the 7 claws to install the air conditioning control assembly.





4. INSTALL LOWER CENTER INSTRUMENT PANEL FINISH PANEL Installation