Removal
2GR-FSE BATTERY / CHARGING: GENERATOR: REMOVAL
1. PRECAUTION (w/ Navigation System for HDD)
NOTICE:
After the engine switch is turned off, the display and navigation module display (HDD navigation system) records various types of memory and settings. As a result, after turning the engine switch off, make sure to wait at least 60 seconds before disconnecting the cable from the negative (-) battery terminal.
2. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL
3. REMOVE COOL AIR INTAKE DUCT SEAL Removal
4. REMOVE ENGINE ROOM SIDE COVER LH Removal
5. REMOVE V-BANK COVER SUB-ASSEMBLY Removal
6. REMOVE INLET NO. 1 AIR CLEANER Removal
7. REMOVE V-RIBBED BELT Removal
8. DRAIN ENGINE COOLANT Service and Repair
9. REMOVE NO. 1 RADIATOR HOSE Removal
10. REMOVE NO. 2 ENGINE COVER Removal
11. REMOVE NO. 2 IDLER PULLEY SUB-ASSEMBLY Removal
12. DISCONNECT WIRE HARNESS
(a) Remove the 3 nuts (A) and disconnect the wire harness.
(b) Disconnect the 2 connectors (B).
13. REMOVE GENERATOR ASSEMBLY
(a) Remove the terminal cap.
(b) Remove the nut (A) and disconnect the wire harness from terminal B.
(c) Remove the bolt (B) and clamp bracket.
(d) Disconnect the generator connector, and detach the 2 clamps.
(e) Remove the nut, and disconnect the generator bracket.
(f) Remove the 2 bolts and generator.
(g) Remove the 2 bolts and 2 generator brackets.