Operation CHARM: Car repair manuals for everyone.

Installation





2GR-FSE STARTING: STARTER: INSTALLATION

1. INSTALL STARTER ASSEMBLY

(a) Install the starter with the 2 bolts.





Torque : 58 Nm (591 kgf-cm, 43 ft-lbf)

(b) Connect the wire harness to terminal 30 and install the nut, and then attach the terminal cap.

Torque : 9.8 Nm (100 kgf-cm, 87 in-lbf)

(c) Connect the terminal 50 connector to the starter assembly.

2. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY LH

HINT
Installation.

3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

4. INSPECT FOR EXHAUST GAS LEAK