Operation CHARM: Car repair manuals for everyone.

Pinpoint Test 6

PINPOINT TEST 6: THE FLASH-TO-PASS FEATURE IS INOPERATIVE

Step 1-Step 4:




Normal Operation
The multifunction switch is supplied voltage from the smart junction box (SJB) through circuit (W/R). When the multifunction switch is placed in the FLASH-TO-PASS position, the voltage is routed to the high beam circuitry.

Possible Causes
- Fuse
- Circuit (W/R) open
- Multifunction switch
- SJB