Canister Purge Solenoid: Testing and Inspection
PURGE SOLENOID VALVE INSPECTION [MZR 2.5]
Airflow Inspection
1. Disconnect the negative battery cable. Removal and Replacement
2. Remove the purge solenoid valve. Service and Repair
3. Inspect airflow between the ports under the following conditions.
- If not as specified, replace the purge solenoid valve. Service and Repair