P0705
DTC P0705 PARK/NEUTRAL POSITION (PNP) SWITCHDescription
- The PNP switch assembly includes a transmission range switch.
- The transmission range switch detects the selector lever position and sends a signal to the TCM.
ON BOARD DIAGNOSIS LOGIC
DIAGNOSTIC TROUBLE CODE (DTC) CONFIRMATION PROCEDURE
CAUTION: Always drive vehicle at a safe speed.
NOTE: If DIAGNOSTIC TROUBLE CODE CONFIRMATION PROCEDURE has been previously conducted, always turn ignition switch OFF and wait at least 5 seconds before conducting the next test.
After the repair, perform the following procedure to confirm the malfunction is eliminated.
With CONSULT-II.
1. Turn ignition switch ON.
2. Select DATA MONITOR mode for ENGINE with CONSULT-II.
3. Start engine and maintain the following conditions for at least 5 consecutive seconds.
VHCL SPEED SE: 10 km/h (6 MPH) or more
THRTL POS SEN: More than 1.3V
Selector lever: D position (OD ON or OFF)
With GST
Follow the procedure With CONSULT-II.
Wiring Diagram-AT-PNP/SW
AT-PNP/SW-01:
AT-PNP/SW-01
Diagnostic Procedure
1. CHECK PNP SWITCH CIRCUIT (WITH CONSULT-II)
With CONSULT-II
1. Turn ignition switch to ON position. (Do not start engine.)
2. Select TCM. INPUT SIGNALS in DATA MONITOR mode for A/T with CONSULT-II.
3. Read out P/N, R, D, 2 and 1 position switches moving selector lever to each position.
Check the signal of the selector lever position is indicated properly.
OK or NG
OK >> GO TO 3.
NG >> Check the following items:
- PNP switch
Refer to Component Inspection.
- Harness for short or open between ignition switch and PNP switch (Main harness)
- Harness for short or open between PNP switch and TCM. (Main harness)
- Ignition switch and fuse
Refer to POWER SUPPLY ROUTING.
2. CHECK PNP SWITCH CIRCUIT (WITHOUT CONSULT-II)
Without CONSULT-II
1. Turn ignition switch to ON position. (Do not start engine.)
2. Check voltage between TCM terminals 26, 27, 34, 35, 36 and ground while moving selector lever through each position.
Voltage
B: Battery voltage
O: 0 V
OK or NG
OK >> GO TO 3.
NG >> Check the following items:
- PNP switch
Refer to Component Inspection.
- Harness for short or open between ignition switch and PNP switch (Main harness)
- Harness for short or open between PNP switch and TCM (Main harness)
- Ignition switch and fuse
Refer to POWER SUPPLY ROUTING.
3. CHECK DTC
Perform AT-115, DIAGNOSTIC TROUBLE CODE (DTC) CONFIRMATION PROCEDURE.
OK or NG
OK >> INSPECTION END
NG >>
1. Perform TCM input/output signal inspection. Pinout Values and Diagnostic Parameters
2. If NG, recheck TCM pin terminals for damage or loose connection with harness connector.
Component Inspection
PARK/NEUTRAL POSITION SWITCH
1. Check continuity between terminals 1 and 2 and between terminals 3 and 4, 5, 6, 7, 8, 9 while moving manual shaft through each position.
2. If NG, check again with control cable disconnected from manual shaft of A/T assembly. Refer to step 1.
3. If OK on step 2, adjust control cable. Refer to Control Cable Adjustment.
4. If NG on step 2, remove PNP switch from A/T and check continuity of PNP switch terminals. Refer to step 1.
5. If OK on step 4, adjust PNP switch. Refer to Park/Neutral Position (PNP) Switch Adjustment.
6. If NG on step 4, replace PNP switch.