Operation CHARM: Car repair manuals for everyone.

Test Point 15 - Engine Speed Signal From EZK

TEST POINT 15: Engine speed signal from EZK

NOTE: the EZK control unit plug must be attached and the LH control unit plug detached.

- At the LH control unit plug, connect terminals 17 and 1 with the engine tester leads, using the test leads.




- Adjust the oscilloscope as stated by its manufacturer. Start the engine with the starter motor. A control signal must be visible on the oscilloscope.