Instrument Panel Compartment Door Replacement
Instrument Panel Compartment Door Replacement
Removal Procedure
1. Remove the right closeout/insulator panel. Refer to Instrument Panel Insulator Panel Replacement - Right Side (Instrument Panel Insulator Panel Replacement - Right Side).
2. Remove the 3 storage compartment retaining screws.
3. Remove the storage compartment from the I/P.
Installation Procedure
1. Position the storage compartment to the I/P.
Caution: Refer to Fastener Caution (Fastener Caution).
2. Install the 3 screws and tighten to 2.5 Nm (22 in. lbs.).
3. Install the right closeout/insulator panel. Refer to Instrument Panel Insulator Panel Replacement - Right Side (Instrument Panel Insulator Panel Replacement - Right Side).