Test 10AC9
TEST 10AC9: CHECK OPEN CIRCUIT IN RELAY BOX GROUND CIRCUIT
Measure resistance between relay box connector and valve relay installing point.
Connector & terminal; (F50) No. 3 & Valve relay installing point No. 87a
CHECK: Is the resistance less than 0.5 ohm?
YES: Test 10AC10
NO: Replace relay box.