Operation CHARM: Car repair manuals for everyone.

Alternator: Service and Repair




Generator: Removal and Installation - QR25DE Models










Removal

1) Disconnect the negative battery terminal. Refer to [Battery: Removal and Installation] Removal and Replacement.
2) Remove engine under cover. Refer to [Front Bumper: Removal and Installation] Service and Repair.
3) Remove front RH fender protector. Refer to [Front Fender Protector: Removal and Installation] Front Fender Protector Removal and Installation.
4) Remove the drive belt. Refer to [Drive Belts: Removal and Installation] Removal and Installation.
5) Disconnect the generator harness connectors.
6) Remove generator nut, using power tools.
7) Remove the generator upper bolt, using power tools.
8) Remove the generator.

Installation

Installation is in the reverse order of removal.

- Be sure the generator spacer is in place on the lower stud.
- Install the generator and check tension of drive belt. Refer to [Checking Drive Belts] Testing and Inspection.






CAUTION:
Be sure to tighten terminal "1" nut carefully.

- For this model, the power generation voltage variable control system that controls the power generation voltage of the generator has been adopted. Therefore, the power generation voltage variable control system operation inspection should be performed after replacing the generator, and then make sure that the system operates normally. Refer to [Power Generation Voltage Variable Control System Operation Inspection] Power Generation Voltage Variable Control System Operation Inspection.