Installation
1GR-FE ENGINE CONTROL SYSTEM: THROTTLE BODY:
INSTALLATION
1. INSTALL THROTTLE WITH MOTOR BODY ASSEMBLY
(a) Install a new gasket and the throttle with motor body with the 4 bolts.
Torque: 11 Nm (112 kgf-cm, 9 ft-lbf)
(b) Connect the throttle motor connector.
(c) Connect the water by-pass hose No. 4.
(d) Connect the water by-pass hose No. 5.
2. INSTALL AIR CLEANER ASSEMBLY
(a) Install the air cleaner with the 2 bolts.
Torque: 8.0 Nm (82 kgf-cm, 71 in-lbf)
(b) Connect the ventilation hose No. 2.
3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 3.9 Nm (40 kgf-cm, 35 in-lbf)
4. ADD ENGINE COOLANT (Service and Repair)
5. CHECK FOR ENGINE COOLANT LEAKAGE (Service and Repair)
6. INSTALL V-BANK COVER
(a) Install the V-bank cover with the 2 nuts.
Torque: 7.5 Nm (76 kgf-cm, 66 in-lbf)