Installation
1GR-FE ENGINE CONTROL SYSTEM: THROTTLE BODY: INSTALLATION
INSTALLATION
1. INSTALL THROTTLE WITH MOTOR BODY ASSEMBLY
(a) Install a new gasket and the throttle with motor body with the 4 bolts.
Torque: 11 Nm (112 kgf-cm, 9 ft-lbf)
(b) Connect the throttle motor connector.
(c) Connect the water by-pass hose No. 4.
(d) Connect the water by-pass hose No. 5.
2. INSTALL AIR CLEANER ASSEMBLY
(a) Install the air cleaner with the 2 bolts.
Torque: 8.0 Nm (82 kgf-cm, 71 in-lbf)
(b) Tighten the 2 hose clamps.
(c) Install the 2 wire harness clamps.
(d) Connect the mass air flow meter connector.
(e) Connect the vacuum hose.
(f) Connect the ventilation hose No. 2.
3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 3.9 Nm (40 kgf-cm, 35 in-lbf)
4. ADD ENGINE COOLANT Service and Repair
5. CHECK FOR ENGINE COOLANT LEAKAGE Service and Repair
6. INSTALL V-BANK COVER
(a) Install the V-bank cover with the 2 nuts.
Torque: 7.5 Nm (76 kgf-cm, 66 in-lbf)