Installation
1GR-FE STARTING: STARTER (for 2WD and Pre-Runner): INSTALLATION
INSTALLATION
1. INSTALL STARTER ASSEMBLY
(a) Install the starter assembly with the 2 bolts.
- Torque: 37 Nm (377 kgf-cm, 27 ft-lbf)
(b) Install the wire harness with the nut to terminal 30.
Torque: 9.8 Nm (100 kgf-cm, 7 ft-lbf)
(c) Connect terminal 50 to the starter assy.
2. INSTALL WIRE HARNESS
(a) Install the earth wire harness onto the cylinder block with the bolt.
Torque: 13 Nm (133 kgf-cm, 10 ft-lbf)
3. INSTALL NO.2 MANIFOLD STAY
(a) Install the manifold stay No. 2 with the 3 bolts.
Torque: 40 Nm (408 kgf-cm, 30 ft-lbf)
4. INSTALL NO.1 ENGINE UNDER COVER SUB-ASSEMBLY (for Off Road Package)
(a) Install the engine under cover with the 4 bolts.
Torque: 30 Nm (306 kgf-cm, 22 ft-lbf)
5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 3.9 Nm (40 kgf-cm, 35 in-lbf)