Heater Control Panel Power Source Circuit
AIR CONDITIONING: AIR CONDITIONING SYSTEM (for Automatic Air Conditioning System): Heater Control Panel Power Source Circuit
- Heater Control Panel Power Source Circuit
DESCRIPTION
Battery voltage is supplied to the heater control panel (A/C control assembly) through the A/C No. 2 fuse.
WIRING DIAGRAM
INSPECTION PROCEDURE
PROCEDURE
1. CHECK HARNESS AND CONNECTOR (IG+ - BODY GROUND)
(a) Disconnect the connector from the heater control panel.
(b) Measure the voltage according to the value(s) in the table below.
Standard voltage:
Result:
C -- GO TO PUSH BUTTON START SYSTEM
B -- GO TO STARTING SYSTEM
A -- Continue to next step.
2. CHECK HARNESS AND CONNECTOR (GND - BODY GROUND)
(a) Measure the resistance according to the value(s) in the table below.
Standard resistance:
NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE Air Conditioning System (For Automatic Air Conditioning System)