Operation CHARM: Car repair manuals for everyone.

Installation





1GR-FE STARTING: STARTER: INSTALLATION

1. INSTALL FLYWHEEL HOUSING SIDE COVER

2. INSTALL STARTER ASSEMBLY

(a) Install the starter with the 2 bolts.

Torque : 37 Nm (377 kgf-cm, 27 ft-lbf)

(b) Connect the starter wire with the bolt and nut.

for bolt - Torque : 8.0 Nm (82 kgf-cm, 71 in-lbf)

for nut - Torque : 9.8 Nm (100 kgf-cm, 87 in-lbf)

(c) Close the terminal cap.

(d) Connect the starter connector.

(e) Connect the ground wire with the bolt.

Torque : 13 Nm (133 kgf-cm, 10 ft-lbf)

3. INSTALL STARTER COVER

(a) Install the starter cover with the 3 bolts.

Torque : 12 Nm (117 kgf-cm, 8 ft-lbf)

4. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY LH

(a) Install the exhaust manifold LH Installation.

5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque : 3.9 Nm (40 kgf-cm, 35 in-lbf)

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.