Heater Control Panel Power Source Circuit
AIR CONDITIONING: AIR CONDITIONING SYSTEM (for Manual Air Conditioning System): Heater Control Panel Power Source Circuit
- Heater Control Panel Power Source Circuit
DESCRIPTION
Battery voltage is supplied to the heater control panel (air conditioning control assembly) through the GAUGE NO. 1 fuse.
WIRING DIAGRAM
INSPECTION PROCEDURE
NOTICE:
Inspect the fuses for circuits related to this system before performing the following inspection procedure.
PROCEDURE
1. CHECK HARNESS AND CONNECTOR (AIR CONDITIONING CONTROL ASSEMBLY - BATTERY)
(a) Disconnect the E10 control connector.
(b) Measure the voltage according to the value(s) in the table below.
Standard voltage:
NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- Continue to next step.
2. CHECK HARNESS AND CONNECTOR (AIR CONDITIONING CONTROL ASSEMBLY - BODY GROUND)
(a) Measure the resistance according to the value(s) in the table below.
Standard resistance:
NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE Air Conditioning System (for Manual Air Conditioning System)