Installation
2GR-FXE EMISSION CONTROL: EGR VALVE: INSTALLATION
1. INSTALL EGR VALVE ASSEMBLY
(a) Install 2 new gaskets and the EGR valve assembly.
(b) Using an E8 "TORX" wrench, install the 2 stud bolts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(c) Install the EGR valve assembly with the 2 nuts.
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)
(d) Connect the 2 water hoses and connector.
(e) Install the No. 2 EGR pipe with the 2 nuts.
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)
2. CONNECT BRAKE MASTER CYLINDER RESERVOIR SUB-ASSEMBLY
(a) Connect the reservoir with the 2 nuts.
Torque : 8.0 Nm (82 kgf-cm, 71 in-lbf)
3. INSTALL V-BANK COVER SUB-ASSEMBLY Installation
4. ADD ENGINE COOLANT Coolant (for Engine)
5. INSPECT FOR COOLANT LEAK (for Engine) Cooling System
6. INSTALL OUTER COWL TOP PANEL SUB-ASSEMBLY Installation
7. INSTALL WINDSHIELD WIPER MOTOR AND LINK ASSEMBLY
Installation