Installation
1AR-FE LUBRICATION: ENGINE OIL COOLER: INSTALLATION
1. INSTALL OIL COOLER ASSEMBLY
(a) Clean the oil cooler contact surface on the cooler mounting.
(b) Apply a light coat of engine oil to 3 new gaskets.
(c) Install the 3 new gaskets to the oil cooler.
(d) Temporarily install the oil cooler with the union bolt, nut and a new seal washer.
(e) Tighten the bolt and nut in several steps, in the sequence shown in the illustration.
Text in Illustration
Union Bolt - Torque : 60 Nm (612 kgf-cm, 44 ft-lbf)
Nut - Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
2. INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE Installation
3. INSTALL EXHAUST MANIFOLD
Installation
4. ADD ENGINE OIL Replacement
5. ADD ENGINE COOLANT Service and Repair
6. INSPECT FOR OIL LEAK Replacement
7. INSPECT ENGINE OIL LEVEL Testing and Inspection