Installation
1AR-FE BATTERY / CHARGING: GENERATOR: INSTALLATION
1. INSTALL GENERATOR ASSEMBLY
(a) Install the wire harness clamp bracket with the bolt.
Torque : 8.4 Nm (85 kgf-cm, 74 in-lbf)
(b) Install the 2 bolts.
Torque : 52 Nm (530 kgf-cm, 38 ft-lbf)
(c) Connect the generator connector to the generator assembly.
(d) Install the generator wire with the nut.
Torque : 9.8 Nm (100 kgf-cm, 87 in-lbf)
(e) Install the terminal cap.
(f) Connect the 2 wire harness clamps.
2. INSTALL FAN AND GENERATOR V BELT
Installation
3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque : 5.4 Nm (55 kgf-cm, 48 in-lbf)
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.