Operation CHARM: Car repair manuals for everyone.

ACC Signal Circuit





LIGHTING (INT): LIGHTING SYSTEM: ACC Signal Circuit
- ACC Signal Circuit

DESCRIPTION

This circuit detects the ignition switch ACC or off condition, and sends it to the main body ECU.

WIRING DIAGRAM





INSPECTION PROCEDURE

NOTICE:
Inspect the fuses for circuits related to this system before performing the following inspection procedure.

PROCEDURE

1. READ VALUE USING TECHSTREAM (ACC SW)

(a) Connect the Techstream to the DLC3.

(b) Turn the ignition switch to ON.

(c) Turn the Techstream on.

(d) Enter the following menus: Body Electrical / Main Body / Data List.

(e) According to the display on the Techstream, read the Data List.

Main Body





OK:

Normal conditions listed above are displayed.

NG -- CHECK HARNESS AND CONNECTOR (INSTRUMENT PANEL JUNCTION BLOCK - BATTERY AND BODY GROUND)

OK -- PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE Interior Lighting System

2. CHECK HARNESS AND CONNECTOR (INSTRUMENT PANEL JUNCTION BLOCK - BATTERY AND BODY GROUND)

(a) Disconnect the 2K and 2D instrument panel junction block assembly connectors.





(b) Measure the voltage according to the value(s) in the table below.

Standard Voltage:





(c) Measure the resistance according to the value(s) in the table below.

Standard Resistance:





Text in Illustration





(d) Reconnect the instrument panel junction block assembly connectors.

NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- Continue to next step.

3. CHECK VEHICLE CONDITION

(a) Check the vehicle condition.

Result





B -- CHECK HARNESS AND CONNECTOR (ACC POWER SOURCE CIRCUIT)
A -- Continue to next step.

4. CHECK HARNESS AND CONNECTOR (INSTRUMENT PANEL JUNCTION BLOCK - IGNITION SWITCH)

(a) Disconnect the 2A instrument panel junction block assembly connector.

(b) Disconnect the D27 ignition switch connector.

(c) Measure the resistance according to the value(s) in the table below.

Standard Resistance:





(d) Reconnect the ignition switch connector.

(e) Reconnect the instrument panel junction block assembly connector.

NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- Continue to next step.

5. INSPECT IGNITION SWITCH

(a) Remove the ignition switch Removal.





(b) Measure the resistance according to the value(s) in the table below.

Standard Resistance:





Text in Illustration





(c) Reinstall the ignition switch.

NG -- REPLACE IGNITION SWITCH Removal
OK -- Continue to next step.

6. INSPECT INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY

(a) Remove the main body ECU from the instrument panel junction block assembly.





(b) Measure the voltage according to the value(s) in the table below.

Standard Voltage:





Text in Illustration





(c) Reinstall the main body ECU to the instrument panel junction block assembly.

NG -- REPLACE INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY

OK -- REPLACE MAIN BODY ECU Removal

7. CHECK HARNESS AND CONNECTOR (ACC POWER SOURCE CIRCUIT)

(a) Disconnect the 2A instrument panel junction block assembly connector.





(b) Measure the voltage according to the value(s) in the table below.

Standard Voltage:





Text in Illustration





(c) Reconnect the instrument panel junction block assembly connector.

NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- Continue to next step.

8. INSPECT INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY

(a) Remove the main body ECU from the instrument panel junction block assembly.





(b) Measure the voltage according to the value(s) in the table below.

Standard Voltage:





Text in Illustration





(c) Reinstall the main body ECU to the instrument panel junction block assembly.

NG -- REPLACE INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY

OK -- REPLACE MAIN BODY ECU Removal